Spring 2017

Geotube project completes 4th straight winter storm season with zero erosion at toe of bluff. As designed, the sand covering the geotubes washes away in larger storms requiring a regrading of the sand supply from above to reset the system. SBPF monitors the geotubes regularly and after every storm. 


No Replies to "Spring 2017"


    Got something to say?

    Some html is OK

    fifteen + seven =