Fall 2015

The fourth geotube tier was installed. SBPF originally requested that the ConCom permanently approve the three tiers of geotubes already in place and allow for the addition of a fourth tier. A fourth tier was approved in November. Experts have indicated that the height of four tiers of geotubes (allowing the top to reach 26 feet on the Mean Low Water datum, which is approximately 16 feet above the base of the bluff, or approximately less than one-fourth the vertical height of the bluff) provides the highest level of protection for the Bluff and Baxter Road.


No Replies to "Fall 2015"


    Got something to say?

    Some html is OK

    6 − three =