Spring 2017
Geotube project completes 4th straight winter storm season with zero erosion at toe of bluff. As designed, the sand covering the geotubes washes away in larger storms requiring a regrading of the sand supply from above to reset the system. SBPF monitors the geotubes regularly and after every storm.
Got something to say?